Material: Metal
Item ID: JU04990
Origin: Guangdong,China

Precautions
Usage steps (with operation pictures):
Step 1: Wipe the smooth surface clean before installation.
Step 2: Wipe the surface to remove water droplets, remove the protective film, and stick it to the wiped clean area.
Step 3: After pasting, remove the air bubbles and press for 30 seconds.
Step 4: Wait more than 12 hours to start using it.




















Reviews
Clear filtersThere are no reviews yet.